Borne, Germany

The doors Borne are synonym for first-class functionality and quality in professional circles. For the premises in Trierweiler, the company has now commissioned an underfeed furnace with a power of 800 kW/th. The convincing technical advantages for the wood-processing industry of the AGRO range AUR were decisive for the acquisition of the biomass boiler in the house Borne.

 

Premises in Trierweiler

 

New year 2015

 

We wish all the people associated with our House a healthy, successful and peaceful year 2015!

The management board and the employees of Agro Forst und Energietechnik GmbH

 

Ein gesundes, erfolgreiches und friedvolles Jahr 2015 wünschen wir allen, die mit unserem Haus in Verbindung stehen!

Geschäftsleitung und Mitarbeiter der Agro Forst und Energietechnik GmbH

 

Nous souhaitons à toutes les personnes en relation avec notre maison une bonne santé, du succès et de la quiétude pour l'année 2015 !

La direction et les employés d'Agro Forst und Energietechnik GmbH

Biomass boiler plant CIDERAL, France

We have equipped the small town Loudéac, located in Brittany on the coast of the Atlantic Ocean, with a 3 MW biomass boiler plant for district heating and local heating.

 The direct proximity with a wooded area (larger than 2500 ha) is a guarantee for an independent delivery of renewable energy. Furthermore this delivery is available at any time.

 The boiler plant contains 2 biomass boilers with a power of 1 MW/th and 2 MW/th and lends itself to the thermic use of natural wood.

 

 

Boiler plant Radenthein

The installation in Radenthein, Carinthia was commissioned right on time for the heating season 2014-2015.

 Radenthein is situated in the valley “Gegendtal”, in the north east of the lake “Milltaätter See” near the Nockberg. At the beginning of the 20th century, magnesite was extracted in open pits for the production of fire proof materials used in the steel and iron industry.

 A modern biomass installation for local and district heat, with a 1MW/th and a 0,5 MW/th boilers as well as a flue gas condensation, was installed. A renewable energy will now be provided and will supply the essential premises to the village on a long-term and reliable basis

.

Furnace 1MW/th and 0,5 MW/th in Radenthein, Carinthia

Installation Freyming

In collaboration with our customer Dalkia France, we have been developing a type of installation which is specially adapted for small towns and which can deliver energy from renewable resources in a very efficient way.

 

 

A standard installation with a power of 4 MW/th was installed in Freyming.

 

 Low planning expenses, quick assembling on site and quick instruction of the operating team, telemaintenance for an ideal functioning  have made this model practically a standard.